

| Control | What it does |
|---|---|
← | Back to the roadmap list |
RM-1 | The roadmap’s key. Part of the shareable URL. |
| Roadmap name | Double-click to rename in place |
| Type chip | Shows Now · Next · Later or Fixed Time Boxes; click for an explanation |
| All / Strategy / Build | Audience filter — see the level toggle |
+ Time box | Adds a column |
Tour | Replays the 6-step guided tour |
| Checklist icon with a number | Opens the backlog panel; the number is how many items are still unplaced |
⋯ | Rename, share, export, delete |

⋯ on each
⋯ renames, recolours
0% · 6 items. ⋯ renames it, recolours it, or removes
spans 2 boxes
Independent items row, labelled UNALIGNED. It is a